Measure Your Steel Plate Warehouse Efficiency – Herochu Shows You the Hidden Leaks and Hands You the Plug
Stop estimating. Start measuring. Herochu’s free warehouse-efficiency audit turns gut feelings into hard numbers, then gives you a drawer-style rack that starts paying for itself the day it lands. CE, UE, ISO 9001 certified, yours from $3 660, custom-cut to the centimetre.
Every workshop has a black hole. You can’t see it, you can’t invoice it, but you fund it every shift. It’s the fifteen minutes the laser sits idle while someone digs for a 4 × 2 m plate buried under three random stacks. It’s the ripple effect of a scratched stainless sheet that becomes a £400 rework order. It’s the sick-day invoice after a 2-ton bundle slips from a sling. Individually these events feel like “part of the job”; together they erode margin faster than any competitor’s discount.
Herochu’s mantra is simple: if you can’t quantify it, you can’t fix it. So before we quote a single upright we park a laser tape and a stop-watch on your floor, map every metre of travel, and build a spreadsheet that screams the truth back at you.
The Five-Minute Audit That Exposes the Bleeding
We don’t arrive with clipboards and generic checklists. One engineer, one tablet, three questions:
- How long does it take to locate the next job’s first plate?
- How many people and machines are tied up in that search?
- What does that dead time cost at your hourly burn rate?
The answers are usually brutal. A Midlands fabricator discovered they spent 2 h 47 m per shift simply “shuffling steel” while a £320/h Trumpf waited. Annual bill: £234 000. Another plant in Barcelona measured 42 % of their hall given over to wide aisles and buffer stacks—rent they paid to store air.
We feed the numbers into a live model that spits out five scenarios, from “do nothing” to “full drawer system,” showing payback curves that rarely stretch past nine months. You keep the report even if you never buy a bolt from us—because once you’ve seen the waste in bold Comic Sans you can’t un-see it.
From Floor-Stack Chaos to Filing-Cabinet Logic
Traditional storage obeys the law of inverse accessibility: the sheet you want is always the heaviest, deepest, last one in. Herochu’s drawer racks reverse that law. Every plate gets its own sliding tray, pulled out like a hanging file. Need the third sheet from the bottom? It’s in front of you in 25 seconds, no forklift ballet, no leaning tower of mild-steel Jenga.
The geometry is mercilessly efficient. One HC-B6020-66 unit stores 30 t of 6 m plate in a 4.5 m² footprint—an 80 % floor-space clawback. Customers regularly fit an extra laser or press brake into the same lease boundary and still gain aisle width.

Safety That Shows Up on the Insurance Ledger
A drawer that can carry 5 t sounds intimidating until you realise it can’t move unless you want it to. Each slide has a positive crank brake and an electric lock that engages the moment the handle stops turning. Optical edges on the beam stop travel in 18 ms if a hand or foot crosses the envelope. The result: one-person, waist-high handling, zero manual lift, zero stack collapse. One Ohio shop saw lost-time injuries drop 38 % the year the racks arrived; their insurer responded with a 12 % premium rebate—cheque signed, risk retired.
Labour: Halve the Heads, Keep the Talent
Time-studies across 28 sites show an average 55 % reduction in handling manpower after install. The task of feeding a 4 kW laser moves from two forklifts and a spotter to one operator with a crank. That’s not head-count reduction; it’s head-count redeployment—skilled welders go back to welding, not babysitting steel.
Machine Uptime: The Laser That Never Waits
A sheet retrieved in 90 seconds instead of 20 minutes gives a 3 kW laser an extra 95 productive hours per year. At £200/h that’s £19 000 per machine—more than the cost of the rack before you count floor space, damage reduction or morale.

Inventory Accuracy: What You See Is What You Quote
When every plate is visible and reachable, cycle-counts become a camera sweep. One photo updates the ERP. No more “I think we have six,” no more rush orders for material you already own, no more customer apologies because the promised stock is welded to the bottom of a stack.
Modular by Design, Future-Proof by Intent
Start with three bays today, clip on two more next year, swap a hand-crank module for a 24 V servo when volumes explode. All parts are hot-dip-galvanised or powder-coated RAL 5015 as standard; stainless rails and ATEX electrics are a PO line-item away.
Sustainability in Steel
Q355B frame, 94 % recycled content, powder-coated with TGIC-free polyester. Bearings are sealed for life, cutting grease waste. At end-of-life 97 % of the rack is recyclable and the remaining 3 % is fasteners you can sell as scrap. Your carbon report will thank you.

Real-World Echoes
“We measured 312 forklift kilometres per month just moving plates around. After the drawer install it dropped to 47 km. That’s 1 200 L of diesel we no longer burn.”
– Jaap D., Rotterdam
“The auditor walked in, saw the crank locks, wrote ‘best-practice’ and left. I’ve never seen him smile before.”
– Sarah K., Ohio
“Payback was quoted at nine months; we hit it in six because the laser stopped napping.”
– Xu Wei, Shanghai

Try Before You Buy—Or Don’t Buy at All
Book the free audit. We’ll laser-measure your hall, clock every shuffle, and email a PDF that shows floor-space reclaimed, labour hours saved, machine uptime gained and injuries avoided. If the numbers don’t make you grin, keep the report anyway—because once you’ve seen the leak, you can plug it with any solution you choose.
But if you decide a Herochu drawer rack is the plug, we’ll credit the audit cost against your first unit. Starting at $3 660, shipped CE-marked and bolt-ready, it’s the cheapest epiphany your balance sheet will ever see.








