banner

Electric automatic telescopic cantilever shelf

One click on the wireless handset and any level glides out 900 mm in six seconds, carrying 750 kg per arm. Bars, pipes, timber, or composites up to twelve metres long suddenly hover under your overhead crane with no fork-lift ballet and no one climbing stock piles. Reclaim up to half your floor space and cut pick time by a third.Static arms force operators to hunt, lift, and drag. Stock leans, gets damaged, and eventually falls. Insurance premiums rise. Floor space balloons. A motorized drawer turns that chaos into a linear assembly line: one operator, one crane, zero walking distance.
Herochu Electric Automatic Telescopic Cantilever Shelf
Starting at USD 4,899 – CE / UE / ISO 9001 – built for the workshop you actually have, not the one you wish you had.
One click on the wireless handset and any level glides out 900 mm in six seconds, carrying 750 kg per arm. Bars, pipes, timber, or composites up to twelve metres long suddenly hover under your overhead crane with no fork-lift ballet and no one climbing stock piles. Reclaim up to half your floor space and cut pick time by a third.
Static arms force operators to hunt, lift, and drag. Stock leans, gets damaged, and eventually falls. Insurance premiums rise. Floor space balloons. A motorized drawer turns that chaos into a linear assembly line: one operator, one crane, zero walking distance.
A 0.75 kW variable-frequency motor drives a 24 mm induction-hardened pinion along a cold-rolled rack rail. Limit switches kill power at full extension; a spring-loaded mechanical pin drops automatically to prevent rollback. Only one drawer can travel at a time—PLC interlock keeps the centre of gravity inside the footprint. Noise level stays below normal conversation.
HC-G6053S 6 m bay 3+1 levels 2 t per level 8 t total single face
HC-G6053D 6 m bay 4+1 levels 3 t per level 25 t total double face
HC-G9055S 9 m bay 5 t per level 35 t total single or double
HC-G9055D 12 m bay 6 t per level 42 t total double face
All numbers are uniformly distributed loads verified by SGS static and fatigue tests. Arm steel grade S355, column grade S460, welded by EN ISO 3834-qualified welders.
Arm length: 550–1 200 mm
Column spacing: 1 200, 1 500, 1 800 mm
Drawer height: 400, 550, 700 mm
Finish: powder-coat orange/blue default, hot-dip galvanized, stainless 304, or custom RAL.
Add-ons: RFID per arm, photocell safety curtain, winter –30 °C grease, WMS software plug-in.
A 9 m double-sided rack stores 42 t in 28 m². Floor stacking the same weight needs 85 m² plus 3 m aisles each side. At European warehouse rent of €65/m²/year the motorized rack frees €3 700 worth of floor every twelve months—before counting faster picks and less scrap.
Mechanical lock prevents two drawers open together.
Emergency cable along the full bay stops all motion.
Overload clutch slips at 110 % rated torque.
Photocell light curtain optional but available.
CE marked to EN 13105-3; fatigue tested 5 000 cycles at 1.25 × load.
Average duty cycle 3 % per eight-hour shift. A five-bay installation uses 0.2 kWh/day—less than a desktop computer. Regenerative braking feeds descent energy back into the capacitor bank, cutting peak current draw by 30 % and allowing a standard 16 A socket supply.
Base plates are laser-cut 16 mm with 26 mm anchor slots. A 6 m double bay weighs 2.8 t and fits in a 40 HQ container. Two technicians and a telehandler can assemble two bays in one shift. Anchor bolts M24 × 180 mm supplied; torque sheet and laser level guide included. No civils work unless your slab is cracked—then we ship free load-spreading plates.
Weekly: brush rail, glance at oil sight glass.
Quarterly: two shots of lithium EP2 grease.
Annually: download PLC log, replace 0.1 L gearbox oil.
Expected life: 20 000 cycles or 12 years single shift. Spare parts kit—pinion, brake pads, limit switch—ships in 48 h.
German steel fabricator, 2024
Before: floor stack, 9 min pick, 1 800 m² floor
After: 5 × HC-G9055D, 3.5 min pick, 950 m² used
Annual saving: €62 k rent + labour
Payback: 11 months
Manual crank: 32 kg pull force every pick.
No interlock: two drawers out = 20 kN·m tip-over moment.
S235 arms: 33 % lower yield than Herochu S355.
No VFD: contactor-only motor fails in 18 months.
No remote: 60 s lost per pick walking to panel.
Send longest bundle length, heaviest bundle mass, clear height.
Receive 2D drawing and quote in four hours.
Approve; 30 % deposit locks production slot.
Balance after live Skype factory test; ship 4–8 weeks anywhere.
If you store long stuff and still use floor space as a shelf, you are paying rent to walk in circles. Herochu’s Electric Automatic Telescopic Cantilever Shelf turns that rent into profit: one click, one drawer, one bundle ready for the crane. Starting at USD 4,899 you buy twelve years of faster, safer, denser storage—welded today, delivered tomorrow, earning money the day after.

Q1: What steps should I take to start the procurement process?

You may get in touch with our backend technical staff first. Based on your specific parameters, we will formulate a suitable technical solution and provide a quotation. Alternatively, you can leave your contact details—such as WhatsApp, WeChat, or email address—and our professional sales team will reach out to you proactively.

Q2: How can I inform you of my need for suitable shelves?

You can share key information with us, including the type of items you plan to store on the shelves, the dimensions of those items, the quantity of shelves required, and any other specific details you have. With this information, we will develop a professional solution tailored to your needs. If you prefer, you can also leave your contact information, and our specialized team will contact you to address your questions.

Q3: Should I choose a loading robotic arm or an integrated loading and unloading system?

To determine the right option, two key factors need to be considered first:
  1. The table size of your laser cutting machine must meet the matching requirements for the equipment.
  2. We need to know your specific loading method—whether it is a board rack, exchange platform, or material warehouse.
For a more accurate recommendation based on your specific needs, please leave your contact information, and we will provide targeted service.

Q4: Do you offer on-site installation and debugging services?

Yes, we do. We can dispatch professional technicians to your factory to carry out on-site installation and debugging of the robotic arm, and we will continue working until the equipment completes a successful trial operation. Our team has provided such services in many countries, including South Africa, the United States, Russia, South Korea, Qatar, Egypt, Lebanon, and Mexico.

Q5: What measures do you take to ensure product quality?

We have a comprehensive quality assurance system, supported by the following key measures:
  • A team of over 40 technical engineers, with professional mechanical engineers responsible for debugging equipment and resolving any technical concerns.
  • A dedicated quality inspection department that strictly adheres to ISO9001 quality standards, ensuring all products meet the required quality specifications.
  • Professional CE certification, which guarantees smooth export procedures for our products to global markets.
  • Mandatory load testing for all equipment before shipment, ensuring the structural safety and operational stability of each product.

Q6: Where is your factory situated?

Our factory is located in Jinan, Shandong Province, China, specifically at No. 10 Industrial Park, Jiyang Street. It features a modern, standard workshop covering an area of 10,000 square meters.

Q7: How can I verify your company’s strength?

We offer two convenient ways for you to assess our company’s capabilities:
  1. We can arrange a video tour of our factory, allowing you to remotely view our production environment and facilities.
  2. We warmly welcome you to visit our factory in person for an on-site inspection.

Q8: What type of company are you?

We are Jinan Constant Storage Machinery Manufacturing Co., Ltd., a high-tech enterprise that integrates research and development, production, sales, installation, and after-sales service. Our core product range includes intelligent sheet metal material warehouses, drawer-type sheet metal shelves, telescopic cantilever shelves, servo swing arm manipulators, gantry loading and unloading manipulators, fully automatic loading and unloading systems, and heavy-duty sheet metal and pipe storage shelves. Equipped with a professional technical team and advanced production equipment, we are committed to providing high-quality, high-performance mechanical products and customized solutions to customers around the world.

Product Category

Sheet Metal Storage Racks
Sheet Metal Storage Racks
Heavy Duty Cantilever Racking System
Heavy Duty Cantilever Racking System
Sheet Metal Material Handling Equipment
Sheet Metal Material Handling Equipment
Automated Sheet Metal Storage Systems
Automated Sheet Metal Storage Systems
Fiber Laser Automation Systems
Fiber Laser Automation Systems

PRODUCTS

Scroll to Top

Contact Us

✶ ✶ ✶ Get a quote and more information now!!!