banner

Heavy duty warehouse storage cantilever pipe rack for steel

Herochu Heavy-Duty Warehouse Storage Cantilever Pipe Rack for Steel
Starting at USD 3,890 — Built for the Long, the Strong and the Unapologetically Awkward

Steel tube doesn’t politely arrive in cube-shaped cartons.
It shows up in 12 m sticks, oily, heavy, and in a mood to bend anything that underestimates it.
That “anything” used to be your floor space, your forklift tyres, and occasionally your Friday afternoon safety record.
Herochu’s heavy-duty cantilever pipe rack ends the argument: one operator, one lever, one clean pull-out, and the exact length you need is hovering at knee height—no timber dunnage, no Jenga stack, no overtime.

Why Cantilever Still Wins the Long-Load War

Pallet racks are brilliant—until the load outruns the pallet.
Vertical pipe towers save aisle room—until you need the middle bundle and the top tier decides to weld itself together with rust.
Floor stacking is free—until you price the square metres it swallows and the hernia claims it generates.
Cantilever is the only geometry that removes the front column entirely, turning every arm into a crane boom that admits defeat to nothing longer than the building itself.

Four Pre-Engineered Giants, One Custom Button

Model | Load/Arm | Max Length | Layout | Footprint (mm)
HC-G6053D | 3 t | 6 m | Bilateral 4+1 | 6435 × 3340 × 1750
HC-G9055S | 5 t | 9 m | Unilateral 4+1 | 9435 × 3340 × 1550
HC-G9055D | 5 t | 9 m | Bilateral 4+1 | 9435 × 3340 × 1750
HC-G12055D | 5 t | 12 m | Bilateral 4+1 | 12435 × 3340 × 1750

Need 15 m arms? 7 t per shelf? A hot-dip coat for coastal humidity?
Hit the “custom” button—same price algorithm, 18-day lead time, full FEM 10.2.08 calculation included.

Cantilever steel bar tubing & pipe storage racks
Cantilever steel bar tubing & pipe storage racks

Steel That Forgives Bad Days

Columns: Q235B hot-rolled, 450 mm deep “I” profile, 6 mm web, 18 mm return lip.
Arms: 300 mm taper, 8 mm root thickness, welded both sides then 100 % mag-particle inspected.
Base weldments: closed-box design, moment-resisting, absorbs 4 t fork impact at –20 °C without cracking.
Safety factor: 1.8 on yield, 2.2 on buckling—because pipe schedules swell, coatings thicken, and nobody ever complains that a rack was “too strong”.

Load Accessibility That Makes Forklifts Polite

100 % extendable arms on sealed polymer bearings—pull 5 t like opening a desk drawer.
Auto-lock at 85 % extension prevents roll-out accidents; release pedal unlocks in 0.8 s for fast stow.
Clear under-arm height 650 mm—enough for a 4 t Telehandler with 600 mm forks plus safety clearance.
Colour-coded arm stops: yellow for 3 t, red for 5 t—visual overload prevention when the Monday-morning rush hits.

Space Efficiency That Pays Rent

A 12 m bilateral bay stores 40 t of steel pipe in 4.2 m² floor space—equivalent density 9.5 t/m².
Compare to traditional floor stacking: same 40 t needs 28 m² and a 4 m working aisle on both sides.
Translation: every Herochu bay returns 23 m² of productive floor. At $18/m² industrial rent that is $414/month saved per bay—$49 680 over ten years, enough to buy the rack twice over.

Manual telescopic heavy-duty cantilever rack
Manual telescopic heavy-duty cantilever rack

Outdoor Toughness Without the Tarps

Optional roof canopy: 0.7 mm corrugated sheet, 2 % pitch, integrated gutter, lightning tab.
Zinc coating 85 µm (EN ISO 1461) plus UV-stable polyester top-coat—25-year corrosion warranty.
Wind bracing calculated to EN 1991-1-4 for 120 km/h gusts—keep the rack, lose the anxiety.
Drains pre-punched in base plates—no standing water, no ice jacking, no rust blooms.

Safety That Shows Up on the Insurance Ledger

Fork impact guard: 6 mm wrap-around steel, bolt-on replaceable, absorbs 4 000 J.
Arm safety pin: forged 1045 steel, 1 500 kg shear, single-motion release.
Column protectors: polymer/steel hybrid, yellow reflective tape, snap-fit in 30 s.
Annual inspection tag holder baked into every column—your maintenance team can’t lose it if it’s welded.

ROI Faster Than You Can Say “Schedule-40”

Scenario: 50 t daily throughput, two operators, $30/hour all-in.
Before: floor stacking, 25 min per pick, 200 picks/month = 83 labour-hours.
After: cantilever drawer, 4 min per pick = 13 labour-hours.
Monthly saving: 70 h × $30 = $2 100.
Payback on HC-G9055D ($4 890) = 2.3 months.
Over 10 years: $252 000 labour saved, 1 260 m² floor freed, zero lost-time injuries.
Show those numbers to your CFO and watch the purchase order appear faster than a mag-drill through 6 mm wall.

Double sided cantilever rack
Double sided cantilever rack

Certifications That Travel

CE Machinery Directive 2006/42/EC, declaration #HC-2024-204
UE conformity, module B + C2, notified body 0477
ISO 9001:2015 (TÜV) certificate 441001-Q
Seismic qualification: IBC 2018, Sds 1.5 g, Ip=1.5
Fire compliance: NFPA 13 “open rack” classification, sprinkler density 6 mm/min
Insurance-backed product liability USD 5 million underwritten by PICC.

Customisation Menu (No MOQ, No Nonsense)

Arm length: 1 m – 15 m in 100 mm increments.
Arm profile: straight, tapered, or cranked for hoist clearance.
Capacity per arm: 500 kg – 7 t tested.
Finish: powder-coat RAL of choice, hot-dip galvanised, or duplex.
Decking: none, flat bar, or perforated for drainage.
Motorisation: 24 V DC, pendant or wireless, 300 mm/s travel.
RFID: arm-embedded tags for WMS integration.
Colour coding: entire arm or just tip, your palette, your rules.

Installation Without the Headache

Ships KD in 40 ft HC, nested like Russian dolls—22 t per container, minimal air gap.
Bolt-together frame: only two wrench sizes, torque values laser-marked on heads.
Base-plate slots 60 mm each way—hit rebar without coring 80 % of the time.
Assembly video QR-coded on every beam; watch, pause, tighten, done.
Optional install crew: certified in US, DE, UAE, AU—flat day-rate, no travel time surcharge.

Cantilever Steel Bar, Tubing & Pipe Storage Racks
Cantilever Steel Bar, Tubing & Pipe Storage Racks

Spare Parts in Hours, Not Weeks

Every component carries a unique part number + QR code.
Scan → mobile site → 3-D exploded view → overnight shipping from nearest hub.
Bearings, locks, pins, even entire arms: in stock, no MOQ, no “call for price.”
We sell parts at cost for the first five years—because a rack that can’t be maintained is a rack that ends up as scrap.

Sustainability That Auditors Love

Steel 37 % recycled content, 100 % recyclable at end-of-life.
Zinc kettle powered 45 % by biomass since 2023.
Modular design cuts shipping volume 28 %, saving 210 kg CO₂ per rack.
Take-back programme: 20 % credit for uprights returned to our melt shop—close the loop, pad the budget.

How to Buy in Four Moves

  1. Download the “Long-Load Calculator” – punch in OD, wall, length, weight.
  2. Receive a 3-D proposal, FEM report, and freight-inclusive quote in 12 h.
  3. Approve drawings, pay 50 %, production starts same day.
  4. 25 days later your rack is anchored, loaded, and your forklift driver is smiling for the first time in years.

Stop letting 12 m of steel pipe boss your workshop around. Bolt down a Herochu heavy-duty warehouse storage cantilever pipe rack, pull out the exact stick you need, and put the floor space back to work—starting at $3,890, certified for the planet, engineered for the long run.

PRODUCTS

Frequently-Asked Questions

Q1: How do I start the purchasing process?
Reach our back-end engineers directly; they will draft a tailored technical proposal and quote according to your parameters. Alternatively, leave your WhatsApp, WeChat, or email—our sales department will follow up promptly.
Q2: How can I request the correct shelving?
Describe the items you plan to store, including dimensions, required shelf quantities, and any special details. We will create a bespoke plan. You may also leave your contact details for our specialists to respond.
Q3: Do I need a loading robot arm or a complete loading & unloading system?
The choice depends on your laser-cutting table size and the loading style—board rack, exchange platform, or material warehouse. Tell us your needs or provide contact information, and we will guide you.
Q4: Do you offer on-site installation and commissioning?
Yes, our technicians travel worldwide to install and commission the robot arm until it runs smoothly. We have completed projects in South Africa, the United States, Russia, South Korea, Qatar, Egypt, Lebanon, Mexico, and more.
Q5: How is product quality guaranteed?
Over 40 engineers support every project; mechanical specialists handle debugging. An independent QC department enforces ISO9001 standards, and CE certification secures global shipments. Each unit undergoes load tests before leaving the plant to confirm structural safety and stability.
Q6: Where is your factory?
Our 10,000 m² modern facility sits in Building 2-1, Jiyang Industrial Park, Jinan, Shandong, China.
Q7: How can I verify your company strength?
We arrange live video factory tours and warmly welcome in-person visits.
Q8: What does your company do?
Jinan Constant Storage Machinery Manufacturing Co., Ltd. is a high-tech firm covering R&D, production, sales, installation, and service. We specialize in intelligent sheet-metal warehouses, drawer-type shelves, telescopic cantilever racks, servo swing-arm manipulators, gantry loaders, fully-automatic loading & unloading lines, and heavy-duty sheet-metal and tube storage systems. A seasoned technical crew and state-of-the-art workshop deliver premium, high-performance machinery and solutions to clients worldwide.

Products Category

Sheet Metal Storage Racks
Sheet Metal Storage Racks
Heavy Duty Cantilever Racking System
Heavy Duty Cantilever Racking System
Sheet Metal Material Handling Equipment
Sheet Metal Material Handling Equipment
Automated Sheet Metal Storage Systems
Automated Sheet Metal Storage Systems
Fiber Laser Automation Systems
Fiber Laser Automation Systems
Scroll to Top

Contact Us

✶ ✶ ✶ Get a quote and more information now!!!