High quality warehouse pipe racking systems
Hot-rolled I-column, bolt-on arm, diagonal brace. Arms wedge-lock at 100 mm pitch without nuts or tools. Load stops flip down to keep pipe from rolling off. Galvanised finish inside and out—no zinc drip, no white rust in humid bays. Choose single-sided to hug a wall, double-sided to create an island, or mobile bases if you rent the building and the landlord keeps moving the walls. Capacities run 410 kg to 1 000 kg per arm as standard; call us and we will push past 1 500 kg without changing the column size—just a thicker arm and a bigger base.
High-Quality Warehouse Pipe Racking Systems
Herochu Cantilever Racks – CE/ISO-certified, tailor-made, from $4,899
Herochu Cantilever Racks – CE/ISO-certified, tailor-made, from $4,899
Specification
|
Specifications
|
Load (single layer)
|
Size
|
Layers
|
Overall dimensions
|
|
HC-G6053D
|
3t
|
6m
|
4+1(Bilateral assistance)
|
6435x3340x1750mm
|
|
HC-G9055S
|
5t
|
9m
|
4+1(Unilateral assistance)
|
9435x3340x1550mm
|
|
HC-G9055D
|
5t
|
9m
|
4+1(Bilateral assistance)
|
9435x3340x1750mm
|
|
HC-G12055D
|
5t
|
12m
|
4+1(Bilateral assistance)
|
12435x3340x1750mm
|
|
Note: Both manual and electric can be customized, and the load-bearing capacity, length, number of layers, and layer height can be customized.
|
||||
Search engines land here when purchasers type:
-
“pipe rack for 6 m steel tube”
-
“heavy-duty cantilever rack CE certified”
-
“warehouse racking for long loads under 5000 USD”
-
“adjustable arm cantilever shelving”
-
“store PVC pipe without bending”
If that is you, read once and leave with a spreadsheet-ready ROI, footprint drawings, and a freight quote.
Why pipe hurts the bottom line
A single 6 m length of DN150 carbon-steel tube weighs 88 kg. Stack twenty on the floor and you have 1.76 t pressing on the bottom piece; lift it later with a chain and you will ovalise the end, scrap the spigot, and blow eighty dollars before the cutter even lights. Herochu cantilever racks float every length on its own arm, no bottom crush, no chain kiss, no hidden scrap. The result is measurable: clients report a 2-4 % drop in material waste within the first quarter—enough to pay for the rack while the paint is still curing.
The anatomy in one breath
Hot-rolled I-column, bolt-on arm, diagonal brace. Arms wedge-lock at 100 mm pitch without nuts or tools. Load stops flip down to keep pipe from rolling off. Galvanised finish inside and out—no zinc drip, no white rust in humid bays. Choose single-sided to hug a wall, double-sided to create an island, or mobile bases if you rent the building and the landlord keeps moving the walls. Capacities run 410 kg to 1 000 kg per arm as standard; call us and we will push past 1 500 kg without changing the column size—just a thicker arm and a bigger base.
Small bay, big bay, same math
Imagine you receive forty bundles of 4 m aluminum extrusion every week. Floor stacking eats 210 m² once you include the 0.6 m finger aisles the forklift demands. Replace that heap with one double-sided cantilever row 24 m long × 3 m high. You now use 29 m², liberate 181 m², and the lease saving alone (€65/m² in most EU markets) funds the rack in fourteen months—before you count scrap reduction, faster handling, or the fact your laser no longer waits for material.
Arm adjustability—live demo
An operator walks up, pulls the spring pin, moves the arm from level four to level two, slaps the pin back—thirty seconds, no wrench. Tomorrow the same bay stores 150 mm stainless bar, next week 300 mm MDF boards. That granularity is why project managers stop asking “How many racks do we need?” and start asking “How fast can we install them?”
Load table you can quote
复制
| Arm length | Capacity per arm | Column height | Centres | Bay weight | Price ex-works |
|---|---|---|---|---|---|
| 600 mm | 1 000 kg | 3 000 mm | 900 mm | 185 kg | $4 899 |
| 800 mm | 900 kg | 4 000 mm | 1 000 mm | 210 kg | $5 450 |
| 1 000 mm | 800 kg | 5 000 mm | 1 200 mm | 245 kg | $6 100 |
| 1 200 mm | 700 kg | 6 000 mm | 1 400 mm | 285 kg | $6 750 |
Prices include columns, arms, braces, base plates, and galvanized finish. Freight is FCA Shanghai; we will consolidate three bays into one 20 GP container and drop the unit freight cost below $280.
Safety extras that insurers notice
-
Arm stop pins welded through the tip, not bolted, so they never shear off.
-
200 mm high containment lips for round bar that likes to escape.
-
Optional rubber face caps to stop aluminum profiles from galling.
-
Column protectors in 5 mm steel wrap the first 400 mm—where forklifts introduce themselves.
-
Earthquake bracing kits for zones > 0.2 g—larger base and cross-brace, 8 % up-charge, certificate included.
Mobile option—same rack, on wheels
Close the aisle when you do not need it, open 1.2 m when you do. Mobile bases carry up to 12 t per bay and move with a manual crank or 0.75 kW electric motor. One client in Madrid reduced aisle width from 3.5 m to 1.4 m and squeezed 40 % more pipe into the same room—no mezzanine, no extension, just rails sunk into the slab.
Installation without the drama
Racks arrive knock-down, one pallet per bay. Two fitters, one impact wrench, 90 minutes. Level the base rails with the supplied shim pack, torque M16 bolts to 220 Nm, snap a photo for the CE file we generate for you. No on-site welding, no hot-work permit, no fire watch. If you relocate, unbolt, stack, ship. Galvanizing survives multiple moves; resale value on the secondary market averages 70 % of invoice.
Applications that pay the bills
Construction – Store 12 m scaffold tube, 300 mm I-beams, composite rebar. Arms adjust when the next project switches from pile casing to PVC conduit.
Wood & panel – Stack 3 m MDF sheets on edge, no bottom warp, no moisture pick-up from the slab.
Oil & gas – Hot-dip galvanized finish handles salt-air yards; arm stops keep 6 m drill pipe from rolling into the access road.
Retail – Single-sided bays painted corporate blue hold 5 m plastic guttering in a 1 m wide aisle, freeing sales floor for impulse-buy fittings.
Wood & panel – Stack 3 m MDF sheets on edge, no bottom warp, no moisture pick-up from the slab.
Oil & gas – Hot-dip galvanized finish handles salt-air yards; arm stops keep 6 m drill pipe from rolling into the access road.
Retail – Single-sided bays painted corporate blue hold 5 m plastic guttering in a 1 m wide aisle, freeing sales floor for impulse-buy fittings.
ROI in real numbers (client file, 2023)
Site: 2 400 m² fabricator, Gdansk
Throughput: 90 t/month carbon-steel tube
Previous method: floor stacking, 312 m²
Scrap rate: 2.8 % (bent ends, chain gouge)
Throughput: 90 t/month carbon-steel tube
Previous method: floor stacking, 312 m²
Scrap rate: 2.8 % (bent ends, chain gouge)
Installation
-
48 m double-sided cantilever, 4 m high, 800 mm arms
-
Cost: $38 400 including freight and install
-
Floor recovered: 264 m²
-
Scrap rate after 6 months: 1.1 %
Annual savings
-
Lease cost avoided: 264 m² × €62/m² = €16 368
-
Scrap reduction: 90 t × 12 × 1.7 % × €650/t = €10 683
-
Labor (30 min less per bundle): 2 880 bundles × 0.5 h × €18/h = €25 920
Total: €52 971 per year
Payback: 8.7 months
The finance director’s comment: “It is not a rack, it is a machine that prints margin.”
Certifications that open doors
Every column and arm is shot-blasted SA 2.5, zinc-coated 80 µm, then oven-cured. Welds are UT-checked per EN ISO 17640. Final structure carries CE marking, Declaration of Performance EN 1993, and ISO 9001:2015 traceability. Present the paperwork to any insurer, auditor, or large-contractor pre-qualification portal and you walk through.
How to order without endless emails
-
Measure longest load, heaviest bundle, clear height, aisle width.
-
Email those four numbers; we return a 3D STEP file and price within six hours.
-
Approve drawing, pay 30 % deposit, production 15 days, ship 30 days.
-
Receive racks, install Saturday, load pipe Monday, invoice faster Tuesday.
The quiet bonus—morale
Operators stop dreading the “tube treasure hunt.” Pick tickets shrink from 20 minutes to 90 seconds, forklifts idle less, and the yard stays tidy enough for customers to walk through without a safety escort. A cleaner, faster warehouse wins more orders than any glossy brochure ever will.
Send us the dimensions. We will send back a rack that stores pipe, protects profit, and pays for itself before the first invoice is due.
Q1: What steps should I take to start the procurement process?
You may get in touch with our backend technical staff first. Based on your specific parameters, we will formulate a suitable technical solution and provide a quotation. Alternatively, you can leave your contact details—such as WhatsApp, WeChat, or email address—and our professional sales team will reach out to you proactively.
Q2: How can I inform you of my need for suitable shelves?
You can share key information with us, including the type of items you plan to store on the shelves, the dimensions of those items, the quantity of shelves required, and any other specific details you have. With this information, we will develop a professional solution tailored to your needs. If you prefer, you can also leave your contact information, and our specialized team will contact you to address your questions.
Q3: Should I choose a loading robotic arm or an integrated loading and unloading system?
To determine the right option, two key factors need to be considered first:
- The table size of your laser cutting machine must meet the matching requirements for the equipment.
- We need to know your specific loading method—whether it is a board rack, exchange platform, or material warehouse.
For a more accurate recommendation based on your specific needs, please leave your contact information, and we will provide targeted service.
Q4: Do you offer on-site installation and debugging services?
Yes, we do. We can dispatch professional technicians to your factory to carry out on-site installation and debugging of the robotic arm, and we will continue working until the equipment completes a successful trial operation. Our team has provided such services in many countries, including South Africa, the United States, Russia, South Korea, Qatar, Egypt, Lebanon, and Mexico.
Q5: What measures do you take to ensure product quality?
We have a comprehensive quality assurance system, supported by the following key measures:
- A team of over 40 technical engineers, with professional mechanical engineers responsible for debugging equipment and resolving any technical concerns.
- A dedicated quality inspection department that strictly adheres to ISO9001 quality standards, ensuring all products meet the required quality specifications.
- Professional CE certification, which guarantees smooth export procedures for our products to global markets.
- Mandatory load testing for all equipment before shipment, ensuring the structural safety and operational stability of each product.
Q6: Where is your factory situated?
Our factory is located in Jinan, Shandong Province, China, specifically at No. 10 Industrial Park, Jiyang Street. It features a modern, standard workshop covering an area of 10,000 square meters.
Q7: How can I verify your company’s strength?
We offer two convenient ways for you to assess our company’s capabilities:
- We can arrange a video tour of our factory, allowing you to remotely view our production environment and facilities.
- We warmly welcome you to visit our factory in person for an on-site inspection.
Q8: What type of company are you?
We are Jinan Constant Storage Machinery Manufacturing Co., Ltd., a high-tech enterprise that integrates research and development, production, sales, installation, and after-sales service. Our core product range includes intelligent sheet metal material warehouses, drawer-type sheet metal shelves, telescopic cantilever shelves, servo swing arm manipulators, gantry loading and unloading manipulators, fully automatic loading and unloading systems, and heavy-duty sheet metal and pipe storage shelves. Equipped with a professional technical team and advanced production equipment, we are committed to providing high-quality, high-performance mechanical products and customized solutions to customers around the world.
PRODUCTS
-
Heavy Duty Cantilever Racking System
Warehouse Cantilever Rack Storage System
Read moreRated 0 out of 5 -
Heavy Duty Cantilever Racking System
High quality warehouse pipe racking systems
Read moreRated 0 out of 5 -
Heavy Duty Cantilever Racking System
Cantilever Racks & Heavy-Duty Shelf Systems for Warehouses
Read moreRated 0 out of 5 -
Heavy Duty Cantilever Racking System
Industrial Roll-out Telescopic Cantilever Rack
Read moreRated 0 out of 5 -
Heavy Duty Cantilever Racking System
Storage solution for long timber packs
Read moreRated 0 out of 5 -
Heavy Duty Cantilever Racking System
Heavy duty Storage racks for steel profiles
Read moreRated 0 out of 5 -
Sheet Metal Storage Racks
Storage steel sheets racks measuring 1500×3000 or 3500mm for 3t sheets
Read moreRated 0 out of 5